Current Date:December 5, 2024

Citycoco Electric Scooter

Citycoco Electric ScooterProduct Name: Citycoco Electric Scooter
Brand Name: Smarda
Place of Origin: Zhejiang, China
Model Number: SMD-U1
Charging Time: 4-6h
Applicable People: Unisex
Certification: CE


Smarda’s Citycoco electric scooter has shock-absorbing suspension at the front and rear. There are 3 LED displays on the body to display speed and power. Two in the front and one in the middle box. 3 Speed switch with reverse gear.

Product Description

Place of Origin Zhejiang, China Brand Name Smarda
Model Number SMD-U1 Power 2000w-3000w
Voltage 60V Certification ce
Charging Time 3h Foldable No
Range Per Charge 40-60km Max Speed >50km/h, 40-50KM/H
Category Two-wheel Scooter Applicable People Unisex
Product name Citycoco Electric Scooter Battery 60V 12AH/20AH /30AH Lithium Battery
Motor power 2000w 3000w Color Normal Colors
Size 2010*380*985mm Keywords Eletric Scooter Citycoco
Tire 12inch Max load 180kg
Weight 70KG Tire Size 12inch.

Product FAQ

1. Who are we?
Yongkang Smart Industry&Trade Co., Ltd. is a professional electric scooter manufacturer in China. Smart focuses on the R&D and production of citycoco series electric scooters, ATVs and children’s scooters. With a professional R&D team and manufacturing base, our products sell well all over the country and are exported to all over the world.

2. Do you test all goods before delivery?
Yes, we have 100% testing before delivery

3. How do you make our business a long-term good relationship?
We maintain good quality and competitive prices to ensure our customers benefit; we respect every customer as our friend, and we sincerely do business and make friends with them, no matter where they come from

4. Can I get your price list?
Yes, please tell us the product (and its model) you are interested in, the quantity, and we will provide the price via email.

5. How long will it take for us to receive the goods?
We will arrange production after confirming the order and making payment. Therefore all scooters are brand new and we will need 7-15 working days to arrange production and less than 7 days for pre-order shipping. Shipping time depends on destination.

6. What are your payment terms?
T/T 30% as deposit, 70% before delivery. We will show you photos of the products and packaging before you pay the balance.

Share

Leave a Reply

Your email address will not be published. Required fields are marked *